参考文献/References:
[1] 胡淑军, 顾琦, 姜俊, 等.自复位SMA支撑的滞回性能与简化力学模型[J].建筑结构学报, 2020, 41(S1):66-75. HU Shujun,GU Qi,JIANG Jun,et al. Hysteretic performance and simplified mechanical model of self-reset SMA support[J]. Journal of Architectural Structure,2020,41(S1):66-75.(in Chinese)
[2] 郭琪, 姜俊, 胡淑军, 等.装配式混凝土框架-Y形偏心钢支撑结构体系抗震性能研究[J].自然灾害学报, 2020, 29(5):140-149. GUO Qi,JIANG Jun,HU Shujun,et al. Study on seismic behavior of prefabricated concrete frame-Y-shaped eccentrically braced steel structure system[J]. Journal of Natural Disasters,2020,29(5):140-149.(in Chinese)
[3] 毛晨曦, 常旭.主余震作用下自复位钢筋混凝土框架结构抗震性能振动台试验研究[J].自然灾害学报, 2019, 28(4):1-12. MAO Chenxi,CHANG Xu. Shaking table test of seismic behavior of self-reset reinforced concrete frame structures subjected to main aftershocks[J]. Journal of Natural Disasters,2019,28(5):1-12.(in Chinese)
[4] 芦静夫, 孙占琦, 邱勇, 等. 新型装配式钢-混凝土组合结构梁柱节点在学校教学楼中的应用[J]. 建筑结构, 2019, 49(S2):498-503. LU Jingfu,SUN Zhanqi,QIU Yong,et al. Application of new prefabricated steel-concrete composite structure beam-column joints in school teaching building[J]. Building Structure,2019,49(S2):498-503.(in Chinese)
[5] Haider H G,Hashim A R,Sulong N H. Seismic performance of innovative hybrid precast reinforced concrete beam-to-column connections[J]. Engineering Structures,2020,202:109886.
[6] 赵俊贤, 于海潮, 潘毅, 等.基于滑移连接的防屈曲支撑钢框架节点抗震性能研究[J].建筑结构学报, 2019, 40(2):117-127. ZHAO Junxian,YU Haichao,PAN Yi,et al. Study on seismic behavior of buckling restrained braced steel frame joints based on slip connections[J]. Journal of Architectural Structure,2019. 40(2):117-127.(in Chinese)
[7] Cheng J J R,Yam M C H,Hu S J. Elastic buckling strength of gusset plate connections[J]. Journal of Structural Engineering,1994,120(2):538-559.
[8] Tsai K C,Hsiao P C,Wang K J,et al. Pseudo-dynamic tests of a full-scale CFT/BRB frame-Part Ⅰ:Specimen design,experiment and analysis[J]. Earthquake Engineering & Structural Dynamics,2008,37(7):1081-1098.
[9] Nabil M, Constantin C, Robert T. Experimental validation of replaceable shear links for eccentrically braced steel frames[J]. Journal of Structural Engineering, 2011, 137(10):1141-1152.
[10] 孙煜坤, 刘琼祥, 刘伟.不等高H形钢梁-钢管再生块体混凝土柱异型节点抗震性能试验研究[J].建筑结构学报, 2020, 41(12):85-92. SUN Yukun,LIU Qiongxiang,LIU Wei. Experimental study on seismic behavior of special-shaped joints of H-shaped steel beams and recycled concrete filled steel tubular columns with unequal height[J]. Journal of Architectural Structure,2020,41(12):85-92.(in Chinese)
[11] 钟根全, 周云, 曹邕生, 等.钢板装配式屈曲约束支撑RC框架平面外力学性能试验研究[J].土木工程学报, 2020, 53(11):74-80. ZHONG Genquan,ZHOU Yun,CAO Yongsheng,et al. Experimental study on out-of-plane mechanical properties of steel plate fabricated buckling restrained braced RC frame[J]. Journal of Civil Engineering,2020,53(11):74-80.(in Chinese)
[12] 张鸿森, 黄炎生, 周靖.多层钢管混凝土柱-铰接钢梁-混凝土核心筒结构振动台试验研究[J].地震工程与工程振动, 2020, 40(2):227-238. ZHANG Hongsen,HUANG Yansheng,ZHOU Jing. Shaking table experimental study on multi-story concrete-filled steel tubular column-hinged steel beam-concrete core tube structure[J]. Earthquake Engineering and Engineering Dynamics,2020,40(2):227-238.(in Chinese)
[13] 高向宇, 李杨龙, 李建勤, 等.钢支撑动力屈曲致扭机理及BRB减扭机理的研究[J].工程力学, 2020, 37(11):83-96, 107. GAO Xiangyu,LI Yanglong,LI Jianqin,et al. Study on dynamic buckling-induced torsion mechanism and BRB torsion reduction mechanism of steel braces[J]. Engineering Mechanics,2020,37(11):83-96,107.(in Chinese)
[14] 江磊鑫. 装配式防屈曲支撑构件设计方法研究[D].北京:清华大学, 2010. JIANG Leixin. Study on the Design Method of Prefabricated Anti-buckling Bracing Members[D]. Beijing:Tsinghua University, 2010.(in Chinese)
[15] GB50017-2017钢结构设计标准[S]. 北京:中国建筑工业出版社, 2017. GB50017-2017 Steel Structure Design Standard[S]. Beijing:China Construction Industry Press,2017.(in Chinese)
[16] 蓝钦宇. 装配式螺栓连接钢筋混凝土柱-钢梁组合框架节点抗震性能研究[D].南昌:南昌大学, 2020. LAN Qinyu. Research on Seismic Performance of Composite Frame Joints of Prefabricated Bolted Reinforced Concrete Column-steel Beam[D]. Nanchang:Nanchang University,2020.(in Chinese)
[17] 朱博莉, 郭彦林.梭形空间桁架约束型防屈曲支撑的性能研究[J].工程力学, 2020, 37(7):35-46. ZHU Boli,GUO Yanlin. Study on the performance of buckling restrained brace with shuttle space truss constraints[J]. Engineering Mechanics, 2020,37(7):35-46.(in Chinese)
[18] CECS 230:2008高层建筑钢-混凝土混合结构设计规程[S]. 北京:中国建筑工业出版社, 2008. CECS 230:2008 Code for the Design of Steel-concrete Mixed Structures for High-rise Buildings[S]. Beijing:China Building Industry Press, 2008.(in Chinese)
[19] 胡淑军. 屈曲约束支撑钢框架的抗震性能研究[D].广州:华南理工大学, 2011. HU Shujun. Research on the Seismic Performance of Steel Structure with Buckling Restrained Brace[D]. Guangzhou:South China University of Technology, 2011.(in Chinese)